|
|
BAYKON FACTORY / Kocaeli - Gebze
Baykon Industrial Wight and Weight Systems Factory
Kocaeli | Gebze
Project Time: 40 days
Application Time: 160 days
Total Area: 1200 m2
An original project including the 1000 m2 interior decoration,facade and landscape design for the building which was completed as the reinforce-concrete and prefabric skeleton located in an industrial estate.
The design criteria is to reflect the vision of the company while breaking the monotonity with a different approach to the facade of the building which is just one of hundreds of the same building the industrial estate.
|