'' PREVIOUS UPDATE
   11.08.2009
   / ADRESS
   / E-MAIL
   / TURKCE

  '' PROJECTS // INDUSTRY CONSTRUCTIONS

01 // BAYKON FACTORY
02 // TECHNOLOGIC WAREHOUSE 01
03 // TECHNOLOGIC WAREHOUSE 02
04 // MECAPLAST FACTORY 01
05 // MECAPLAST FACTORY 02
06 // FARBA FACTORY
07 // CANKAR FACTORY
08 // LOGITURC PARK TUZLA
09 // KALIPYANSAN FACTORY
10 // CIMPOR YIBITAS CEMENT FACTORY
11 // TUNAYLAR WEIGHBRIDGE FACTORY
12 // MECAPLAST INDIA FACTORY(new)

00 // ALL PROJECTS
  MECAPLAST FACTORY 01 / Kocaeli - Gebze



Mecaplast Automotive Products Factory 01
Kocaeli | Gebze
Project Time : 30 days
Applicaton Time: 135 days
Total Area: 4.500 m2

The 26. factory  in the world of the French Company.
The building includes offices of 1000 m2 total and a production hall of 3500 m2.
The 53 m long and 6,5 m high front facade of the building where the management offices are located is designed as two seperate solid blocks  which are connected to each other with a glass block where sunbreakers are used.
In the entrance hall gallery,the open-riser stair which is made of concrete cantilever steps is one of the main decorative elements of the design.
The production hall is built with steel construction. With the 75 m long sky light,the usage of natural day light is maximized in the production hall.
The visual connection between the production hall and the management offices is one of the main design criterias of the project.
IGLO_ARCHITECTS_PROJECT_&_CONS.