  CANKAR / Istanbul - Dudullu



Cankar Integrated Meat Processing Institution
Istanbul Dudullu
Project Time : 85 days
Application Time: Go on.
Total Area : 3.000 m2

Cankar Meat Processing Factory building accomodating 600 m2 offices and 3000 m2 production area.
The production facilities are placed at the three floors underground considering some technical necessities whereas the offices are planned on the two floors above the ground, including the ground floor.
The natural limitations  of the land and the location led to the   the concrete-mass schematic design in this project.
The problems contributed to the design with their solutions.