Cankar Meat Processing Factory building accomodating 600 m2 offices and 3000 m2 production area.
The production facilities are placed at the three floors underground considering some technical necessities whereas the offices are planned on the two floors above the ground, including the ground floor.
The natural limitations of the land and the location led to the the concrete-mass schematic design in this project.
The problems contributed to the design with their solutions.