'' PREVIOUS UPDATE
   11.08.2009
   / ADRESS
   / E-MAIL
   / TURKCE

  '' PROJECTS // INDUSTRY CONSTRUCTIONS

01 // BAYKON FACTORY
02 // TECHNOLOGIC WAREHOUSE 01
03 // TECHNOLOGIC WAREHOUSE 02
04 // MECAPLAST FACTORY 01
05 // MECAPLAST FACTORY 02
06 // FARBA FACTORY
07 // CANKAR FACTORY
08 // LOGITURC PARK TUZLA
09 // KALIPYANSAN FACTORY
10 // CIMPOR YIBITAS CEMENT FACTORY
11 // TUNAYLAR WEIGHBRIDGE FACTORY
12 // MECAPLAST INDIA FACTORY(new)

00 // ALL PROJECTS
  MECAPLAST FACTORY / India



Mecaplast Factory / India
Project Time: 30 gün
Management Building Area: 8000 m2

The Project includes designing a factory for the French automotive firm at the industrial region in India-Chennai. The high temperature of the zone and monsoon rains shaped the conceptual approach of the project. The use of natural methods for cooling and ventilation of the production areas provided significant energy savings.

 




IGLO_ARCHITECTS_PROJECT_&_CONS.