|
|
MECAPLAST FACTORY / India
Mecaplast Factory / India
Project Time: 30 gün
Management Building Area: 8000 m2
The Project includes designing a factory for the French automotive firm at the industrial region in India-Chennai. The high temperature of the zone and monsoon rains shaped the conceptual approach of the project. The use of natural methods for cooling and ventilation of the production areas provided significant energy savings.
|