Logipark Phase II
Project Area: 126.000m²
Project Location: Tuzla / İstanbul
Project Date: 2008
Construction Date: 2013
Logipark Project was prepared in 3 phases;A,B,C, and D Blocks were drawn in the first phase, E, F and G were drawn in the second phase and H Block was drawn in the third phase. In addition to these a data center building, an Office building and a restaurant building was designed in the same campus but these buildings have not been constructed yet.