MECAPLAST I

Project Area : 3.500 m²
Project Location : TOSB / GEBZE,
Project Date : 2001
Construction Date : 2002

The building includes offices and a production hall. Offices are located at the front facade which is designed as two seperate solid blocks connected with a glass block . The concrete cantilever stairs in the entrance hall gallery is one of the main decorative elements of the design. The production hall is illuminated by natural daylight through the long sky light. The visual connection between the production hall and the management offices is one of the main design criterias of the project.