Proje Area: 11.500 sqm
Project Location: Chennai-India
Project Date: 2010
Construction Date: 2011

The 3rd factory building we designed for the French Automotive Company. The tropical climate of the region have shaped the conceptual design of the project. It is important to ventilate and cool the production areas with completely natural methods and also to save energy. The cage structure on the facade of the office block is designed as an aesthetic element to serve for safety as well as avoiding sun. This facade system was also used in the veil of mechanical parts beside the production building.